US$ 140.00
Designed as part of the Gold Ring Steam Series
This model includes a 39-inch lead cable and an integrated SPDT auxiliary switch for end-switch signaling or auxiliary equipment interlocking
Exact OEM Calibration: The pre-set 0
and Concord heating systems
The ASCO 8210G9HW requires a minimum differential pressure of 5 PSI to ensure the diaphragm lifts and closes correctly
Burnham Boiler 6112901 Cover Plate 323269-701 Designed as part of theFor service professionals maintaining multi pass cast iron heat exchangers, the Burnham Boiler 6112901 Cover Plate is a specific OEM replacement engineered for high efficiency flue management. This flue cover plate plays a critical role in sealing the secondary heat transfer surfaces of the Burnham V9 series and V8 series residential boilers. Constructed from formed steel, this plate is designed to withstand the thermal stresses found in gas fired